DoubleMCX: The 2110 Project Bridge Dashboard

2110 Topo

Step Info Status Map Resources Risks
Phase 1: Setting the Stage
System Proposal πŸ“– πŸ“Š πŸ“ SMPTE ST 2110 IP Media Roadshow
ST 2110 Solution Guides
Create "Program Document" (Optional) πŸ“– πŸ“Š πŸ“ SMPTE ST 2110 Standards Overview
PTP Within ST 2110 Deployments (Riedel)
PTP Done Right (Key Code Media)
IP Infrastructure Solutions (Qvest)
Create Software Functionality Document (Optional) πŸ“– πŸ“Š πŸ“ SMPTE ST 2110-10 (System Timing)
EBU 3371: The Technology Pyramid for Media Nodes
AMWA NMOS IS-04 & IS-05 Scalability
Control Plane vs. Data Plane
ST 2110-21: Traffic Shaping for SW Implementations
JT-NM Tested Program:
Scope of Work πŸ“– πŸ“Š πŸ“ Main NMOS Specifications Hub
IS-04: Discovery & Registration
IS-05: Device Connection Management
IS-05: Device NMOS IS-04 and IS-05 Interoperability Guidelines
AMWA NMOS Parameter Registers
Upfront Considerations πŸ“– πŸ“Š πŸ“ SMPTE ST 2110 Standards Suite Overview
Cisco Validated Design – Blueprint for IP Media Success
Designing SMPTE 2059-2 PTP Networks
Avoiding Traps and Pitfalls When Designing SMPTE 2059-2 Networks
What to do πŸ“– πŸ“Š πŸ“ SMPTE ST 2110 IP Media Roadshow Engineering Docs
JT-NM Tested Program
What not to do πŸ“– πŸ“Š πŸ“ Design Deterministic Systems using SMPTE ST 2110-21
PacketStorm – SMPTE ST 2110 Explained: Margin & Virtual Buffer
Phase 2: Project Kickoff & Hand-off      
The Project Kickoff - Project hand off from Proposals to Engineering πŸ“– πŸ“Š πŸ“ Kickoff Meeting Template
The usual project stakeholdersπŸ“–πŸ“ŠπŸ“Stakeholder Directory
Project StartπŸ“–πŸ“ŠπŸ“Project Charter
Design ReviewsπŸ“–πŸ“ŠπŸ“Review Agenda Template
Obtain All Relevant DocumentsπŸ“–πŸ“ŠπŸ“Document Checklist
Other "Docs"πŸ“–πŸ“ŠπŸ“Vendor Docs Repository
Review Contractual "Scope of Work"πŸ“–πŸ“ŠπŸ“SOW Review Checklist
Create "Preliminary" Equipment ListπŸ“–πŸ“ŠπŸ“Equipment List Template
Gather "Cut Sheets," "Configuration Guides," "Install Manuals"πŸ“–πŸ“ŠπŸ“Vendor Manual Database
Phase 3: Preliminary Project Design
Floor LoadingπŸ“–πŸ“ŠπŸ“Floor Load Calculator
ConfigurationπŸ“–πŸ“ŠπŸ“Rack Layout Templates
AirflowπŸ“–πŸ“ŠπŸ“Airflow Analysis Sheet
Building PowerπŸ“–πŸ“ŠπŸ“Load Calculation Sheet
Rack and Console Power Requirements and InterfaceπŸ“–πŸ“ŠπŸ“Power Worksheet
Required CircuitsπŸ“–πŸ“ŠπŸ“Circuit Schedule
Utility OutletsπŸ“–πŸ“ŠπŸ“Outlet Plan
Technical GroundingπŸ“–πŸ“ŠπŸ“Grounding Diagram
Power Conditioning and AvailabilityπŸ“–πŸ“ŠπŸ“UPS & PDU Specs
Circuit BreakersπŸ“–πŸ“ŠπŸ“Breaker Schedule
Building Space RecommendationsπŸ“–πŸ“ŠπŸ“Space Planning Guide
Rack Space Requirements and DimensionsπŸ“–πŸ“ŠπŸ“Rack Elevation Templates
Facility ConditionsπŸ“–πŸ“ŠπŸ“Site Survey Checklist
Building FacilitiesπŸ“–πŸ“ŠπŸ“Facility Spec Sheet
LightingπŸ“–πŸ“ŠπŸ“Lighting Plan
Heating, Ventilation, Air Conditioning, and Cooling (HVAC)πŸ“–πŸ“ŠπŸ“HVAC Load Calc
Equipment Environmental SpecificationsπŸ“–πŸ“ŠπŸ“Environmental Spec Sheet
Fire ProtectionπŸ“–πŸ“ŠπŸ“Fire Suppression Guide
Openings and DuctsπŸ“–πŸ“ŠπŸ“Duct & Opening Plan
TelephonesπŸ“–πŸ“ŠπŸ“Telecom Plan
Building / Site AccessπŸ“–πŸ“ŠπŸ“Access Requirements
Loading DockπŸ“–πŸ“ŠπŸ“Dock Spec Sheet
Roads and ParkingπŸ“–πŸ“ŠπŸ“Site Access Map
Roof Access - DNAπŸ“–πŸ“ŠπŸ“Roof Access Notes
Keys / Badges / Access TimesπŸ“–πŸ“ŠπŸ“Access Policy
Connections to Other Vendors / AreasπŸ“–πŸ“ŠπŸ“Interface Matrix
Signal InterfacesπŸ“–πŸ“ŠπŸ“Signal Flow Diagram
Telecommunications InterfacesπŸ“–πŸ“ŠπŸ“Telecom Spec
AC Power and Grounding RecommendationsπŸ“–πŸ“ŠπŸ“Power & Ground Spec
Isolated, Conditioned Tech PowerπŸ“–πŸ“ŠπŸ“PDU/UPS Schedule
Isolated Safety Ground (Green Wire)πŸ“–πŸ“ŠπŸ“Grounding Diagram
Equipment GroundingπŸ“–πŸ“ŠπŸ“Ground Plate Spec
Reference Ground PlateπŸ“–πŸ“ŠπŸ“Ground Plate Drawing
Assigning Abbreviations/MnemonicsπŸ“–πŸ“ŠπŸ“Mnemonics Guide
Unique identificationπŸ“–πŸ“ŠπŸ“Naming Convention
Create "Abbreviations List"πŸ“–πŸ“ŠπŸ“Abbreviations Template
Create the Room and Equipment MnemonicsπŸ“–πŸ“ŠπŸ“Mnemonic Master List
Create "Floor Plans"πŸ“–πŸ“ŠπŸ“Visio / AutoCAD Templates
Create "Rack and Console Elevations"πŸ“–πŸ“ŠπŸ“Elevation Templates
Logic of Bay and Rack NumberingπŸ“–πŸ“ŠπŸ“Numbering Standard
Future ExpansionπŸ“–πŸ“ŠπŸ“Expansion Plan
Phase 4: The False Promise of "Plug and Play"
Core Flow: Multicast Setup & IGMP in ST 2110 πŸ“– πŸ“Š πŸ“ Full Core Flow Guide + Popup Reference
1. Fabric – Leaf / Spine πŸ“– πŸ“Š πŸ“ Leaf-Spine Topology Guide
2. Addressing – Multicast Plan πŸ“– πŸ“Š πŸ“ Multicast Address Plan Template
3. Underlay – Routing πŸ“– πŸ“Š πŸ“ VLAN & Underlay Routing Guide
4. IGMP – Who gets streams πŸ“– πŸ“Š πŸ“ IGMP Snooping & Querier Config
5. PIM – Routing multicast πŸ“– πŸ“Š πŸ“ PIM-SM Configuration Guide
6. QoS – Priority πŸ“– πŸ“Š πŸ“ Media Flow QoS Policy
7. PTP – Timing πŸ“– πŸ“Š πŸ“ ST 2059 PTP Design
8. Redundancy – 2022-7 πŸ“– πŸ“Š πŸ“ ST 2022-7 Seamless Switching
9. NMOS – Control πŸ“– πŸ“Š πŸ“ NMOS IS-04 / IS-05 Setup
10. Monitoring – Visibility πŸ“– πŸ“Š πŸ“ Prometheus / Grafana Templates
Phase 5: The "Thermal Tax": The Hidden Cost of Bits
SFP+ / QSFP Heat Gradient AnalysisπŸ“–πŸ“ŠπŸ“DoubleMCX Power & Heat Calc
Leaf-Spine Fabric Power BudgetπŸ“–πŸ“ŠπŸ“Switch Power Calculator
Phase 6: The Control Plane vs. The Data Plane: The Great Disconnect
Out-of-Band (OOB) Management Network DesignπŸ“–πŸ“ŠπŸ“Network Topology Map
Control Plane Redundancy StrategyπŸ“–πŸ“ŠπŸ“Redundancy Matrix
Phase 7: Redundancy is Not Resilience
ST 2022-7 Seamless Switching AuditπŸ“–πŸ“ŠπŸ“Redundancy Validation Tool
Monitoring & Alerting StrategyπŸ“–πŸ“ŠπŸ“Grafana / Prometheus Template
Phase 8: The Human Factor: Training the "Bridge Generation"
Training the "Bridge Generation"πŸ“–πŸ“ŠπŸ“Wireshark Lab Guides + Training Plan
Phase 9: The Readiness Audit
Final Net-Ready CommissioningπŸ“–πŸ“ŠπŸ“EBU LIST Testing Protocol
Overall Readiness Scorecard & Go/No-Go DecisionπŸ“–πŸ“ŠπŸ“Final Dashboard Export